| This two day workshop
will initiate engineers to prepare and develop plot plans, prepare
the piping layouts, their sizing, selection of components, design
and analysis. There will be demonstration of software related to
Piping Technology on the second day of the seminar. |
| |
|
Coverage |
|
Piping Technology: |
| ▪ |
Understanding of Process Flow Diagrams, P&I Diagrams,
Interpretations, Plot Plan & Equipment layout generation. |
| ▪ |
Introduction
to ASME B31.3 and other codes related to Process Piping. |
| ▪ |
Application
of Piping to Pumps & Compressor systems. |
| ▪ |
Selection
of Piping Components (Flanges, Fittings, Valves, Supports,
Expansion Joint etc) |
| ▪ |
Piping Plan, Pipe Sizing, Development of Isometric drawings. |
| ▪ |
Flow and
Pressure Drop Calculations. |
| ▪ |
Selection
of Materials for Process Piping Components. |
| ▪ |
Stress
Analysis, Flexibility Stress Analysis. |
| ▪ |
Exposure to
piping Stress Analysis Design software & Problem solving session
using softwares like AutoPIPE, PlantFLOW, WinNozl of Bentley’s
USA. |
| ▪ |
Non
Destructive Examination of Piping. |
|
| |
|
|
|
Venue: |
| |
Auckland, New Zealand. |
|
Registration: |
| |
The registration fee is NZD 1200 + GST @ 12.5%= NZD 1350. |
| |
In case of registration before 31st July 2006
registration fee will be NZD 1000+ GST @ 12.5%= NZD 1125
|
|
Contact: |
| |
Charisma
Global Networks Ltd.(Programme
Co-ordinator) |
| |
PO Box
202049, |
| |
Southgate
Centre, Auckland. |
| |
New
Zealand. |
|
Workshop on Piping Technology, Auckland, New Zealand
Schedule |
| |
Date 4th Oct 2006 |
| |
9.30 AM:
|
Inauguration of the Workshop on Piping Technology |
| |
9.45 AM: |
Process
Flow Diagram, Guidelines for preparation of Plot Plans, Equipment
Layout of
Hydrocarbon Processing units. |
| |
11.00 AM:
|
Tea |
| |
11.20 AM:
|
Good
Engineering Practice for Development of Plot Plan and Equipment
Layout. |
| |
|
Tips for Good Plant Layout |
| |
|
Special
Safety Requirements Guide for Plant & Equipment
Layout of Hydrocarbon Processing Units |
| |
1.00PM -2.00PM:
|
Lunch |
| |
2.00PM: |
Piping &
Instrumentation (P&I) Diagrams |
| |
|
Sizing of
Piping System, Recommended Velocities |
| |
3.00PM-3.15PM: |
Tea Break |
| |
3.15 PM:
|
Piping
Sizing and Pressure Drop calculations |
| |
|
Tips to improve the Operation & Reliability of Steam
Distribution
System |
| |
|
Designing &
Maintaining Plant Piping & Valve System |
| |
5.00PM
|
Close |
| |
Date 5th Oct 2006 |
| |
9.30 AM:
|
Centrifugal Pump PipingSelection
of Pipes and Fitting |
| |
|
Selection
of Engineering Materials for Piping Components |
| |
11.00 AM:
|
Tea Break |
| |
11.20 AM:
|
Design of Piping System (ASME B.31.3)
Introduction to Bentley AutoPIPE, PlantFLOW & WinNOZL |
| |
1.00PM -2.00PM:
|
Lunch
Break |
| |
2.00PM: |
Software
Demonstration & Exercise. |
| |
3.00PM-3.15PM: |
Tea Break |
| |
3.15 PM:
|
Software
Demonstration & Exercise (Cont) |
| |
|
Tips to improve the Operation & Reliability of Steam
Distribution
System |
| |
|
Designing &
Maintaining Plant Piping & Valve System |
| |
4.00PM
|
Vote of Thanks
/ Close |
| |
|
| |