New Page 1
Know Us
 

         PIPING TECHNOLOGY   

 
   

UNIQUE WORKSHOP ON PIPING TECHNOLOGY OCT 4 – 5, 2006, Auckland New Zealand

 
This two day workshop will initiate engineers to prepare and develop plot plans, prepare the piping layouts, their sizing, selection of components, design and analysis. There will be demonstration of software related to Piping Technology on the second day of the seminar.
 
Coverage

 Piping Technology:

Understanding of Process Flow Diagrams, P&I Diagrams, Interpretations, Plot Plan & Equipment layout generation.
Introduction to ASME B31.3 and other codes related to Process Piping.
Application of Piping to Pumps & Compressor systems.
Selection of Piping Components (Flanges, Fittings, Valves, Supports, Expansion Joint etc)
Piping Plan, Pipe Sizing, Development of Isometric drawings.
Flow and Pressure Drop Calculations.
Selection of Materials for Process Piping Components.
Stress Analysis, Flexibility Stress Analysis.
Exposure to piping Stress Analysis Design software & Problem solving session using softwares like AutoPIPE, PlantFLOW, WinNozl of Bentley’s USA.
Non Destructive Examination of Piping.
     
Venue: 
  Auckland, New Zealand.
Registration: 
  The registration fee is NZD 1200 + GST @ 12.5%= NZD 1350.
  In case of registration before 31st July 2006 registration fee will be NZD 1000+ GST @ 12.5%= NZD 1125  
Contact:
  Charisma Global Networks Ltd.(Programme Co-ordinator)
  PO Box 202049,
  Southgate Centre, Auckland.
  New Zealand.
Workshop on Piping Technology, Auckland, New Zealand Schedule
  Date 4th Oct 2006
  9.30 AM:  Inauguration of the Workshop on Piping Technology
  9.45 AM:  Process Flow Diagram, Guidelines for preparation of Plot Plans, Equipment

Layout of Hydrocarbon Processing units.
  11.00 AM: Tea
  11.20 AM: Good Engineering Practice for Development of Plot Plan and Equipment Layout.
    Tips for Good Plant Layout
    Special Safety Requirements Guide for Plant & Equipment Layout of Hydrocarbon Processing Units
  1.00PM -2.00PM: Lunch
  2.00PM: Piping & Instrumentation (P&I) Diagrams
    Sizing of Piping System, Recommended Velocities
  3.00PM-3.15PM: Tea Break
  3.15 PM: Piping Sizing and Pressure Drop calculations
    Tips to improve the Operation & Reliability of Steam Distribution System
    Designing & Maintaining Plant Piping & Valve System
  5.00PM   Close
  Date 5th Oct 2006
  9.30 AM:  Centrifugal Pump PipingSelection of Pipes and Fitting
    Selection of Engineering Materials for Piping Components
  11.00 AM: Tea Break
  11.20 AM: Design of Piping System (ASME B.31.3) Introduction to Bentley AutoPIPE, PlantFLOW & WinNOZL
  1.00PM -2.00PM: Lunch Break
  2.00PM: Software Demonstration & Exercise.
  3.00PM-3.15PM: Tea Break
  3.15 PM: Software Demonstration & Exercise (Cont)
    Tips to improve the Operation & Reliability of Steam Distribution System
    Designing & Maintaining Plant Piping & Valve System
  4.00PM   Vote of Thanks / Close
   
  >>Click here to register now<< 

 
New Page 1

Copyright © 2003 Charisma Global Networks Ltd.